Project Background/Challenges: The Jiangsu section of the Beijing-Shanghai Expressway, a national main road, experiences heavy traffic. Traditional high-pressure sodium lamps have excessively high energy consumption (400W/lamp), high maintenance costs (annual maintenance exceeding 80,000 RMB), and l
Project Background/Challenges: The industrial park parking lot required zoned lighting, energy optimization, and wind and rain resistance design. Traditional fluorescent lamps suffered from uneven illumination, high energy consumption, and insufficient safety at night.HTY Solution: Customized wind a
Project Background/Challenges: The scenic area needed to create an immersive night tour themed around Tang Dynasty poetry. Traditional lighting could not meet the artistic requirements, and the system needed to withstand corrosion, water, and long-term outdoor operation.HTY Solution: The solution e